Supercomputers/Sites/SciNet (University of Toronto)
Toronto · Canada
SciNet (University of Toronto)
Operated by SciNet. Hosting 4 systems in this dataset, 2 of them currently operational.
- Systems hosted
- 4
- Installed Rmax
- 13.81 PFlop/s
- Recorded power
- 1.25 MW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for SciNet (University of Toronto), each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| PUE | 1.2 SciNet paper (J. Phys. Conf. Ser. 256, 2010): measured average annual PUE below 1.2 (recorded as an upper bound), design point 1.16. Describes the original GPC/TCS data centre. | 2010 | Operator stated | pages.scinet.utoronto.ca |
| Machine-room floor area | 290 m2 Computer room of 3,100 sq ft (290 m2) within 12,000 sq ft of rented warehouse space roughly 30 km north of the St. George campus. | 2010 | Operator stated | pages.scinet.utoronto.ca |
| Facility power | 4 MW Local power availability of about 4 MW through a dedicated, separately metered 600 V, 4,000 A feed; the systems themselves approached 2 MW. | 2010 | Operator stated | pages.scinet.utoronto.ca |
| Cooling | Direct-to-rack water cooling with a centrifugal chiller and rooftop cooling tower; three 35-ton air handlers for the remaining air-cooled row Same 2010 paper; original facility design. | 2010 | Operator stated | pages.scinet.utoronto.ca |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Trillium | 9.49 PFlop/s | - | 2025-08-07 | operational |
| Niagara | 3.60 PFlop/s | 919.42 kW | 2018-03 | decommissioned |
| BGQ (SOSCIP) | 715.55 TFlop/s | 328.75 kW | 2012-08 | decommissioned |
| Killarney | - | - | - | operational |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.