Operated by RIKEN. Hosting 4 systems in this dataset, 3 of them currently operational.
- Systems hosted
- 4
- Installed Rmax
- 4.26 PFlop/s
- Recorded power
- 578.8 kW
- Cooling
- Single-phase immersion
all eras, as reported
where disclosed
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| HOKUSAI BigWaterfall | 1.60 PFlop/s | - | 2017 | operational |
| HOKUSAI GreatWave | 990.00 TFlop/s | 518.4 kW | 2015-04 | decommissioned |
| Shoubu | 610.00 TFlop/s | - | 2015 | operational |
| Shoubu System B | 1.06 PFlop/s | 60.4 kW | - | operational |