Supercomputers/Sites/IREN Childress Campus
Childress, TX · USA
IREN Childress Campus
Operated by IREN. Hosting 1 system in this dataset, 1 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 0.0 GFlop/s
- Recorded power
- 0 kW
- Cooling
- Direct-to-chip cold plate
Facility facts
Power, cooling and efficiency figures for IREN Childress Campus, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Facility power | 750 MW Childress campus described as a 750 MW facility connected directly to ERCOT through on-site substations. | 2025-11 | Press report | techinformed.com |
| IT power | 200 MW About 200 MW of IT load across the four Horizon data centers under the Microsoft contract. | 2025-11 | Press report | techinformed.com |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| IREN Childress Horizons 1-4 (Microsoft) | - | - | 2026-08 | operational |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.