Operated by Georgia Institute of Technology. Hosting 1 system in this dataset, 1 of them currently operational.
- Systems hosted
- 1
- Installed Rmax
- 1.84 PFlop/s
- Recorded power
- 0 kW
- Cooling
- -
Facility facts
Power, cooling and efficiency figures for Georgia Tech Coda Data Center, each with its own source and date.
| Fact | Value | As of | Basis | Source |
|---|---|---|---|---|
| Facility power | 2 MW Power capacity allocated to Georgia Tech in Coda: 500 kW for enterprise and 1,500 kW for research cyberinfrastructure; the data center is designed to expand in phases to 10 MW | 2025-05 | Operator stated | bpb-us-e1.wpmucdn.com |
| Cooling | Dedicated chilled-water loop per floor with heat exchangers, heat recovery units and water- and air-side economisation; 55-ton CRAHs below 15 kW per rack and rear-door heat exchangers up to 50 kW per rack Rear-door water is typically supplied at 70 F with inlet air averaging 76 F | 2025-05 | Operator stated | bpb-us-e1.wpmucdn.com |
| Power supplier | Georgia Power, through two geographically diverse switchable 20 kV and 4,160 V feeds; a Georgia Power research microgrid of fuel cells, batteries and micro-turbines can supply up to 1.5 MW | 2025-05 | Operator stated | bpb-us-e1.wpmucdn.com |
| Machine-room floor area | 7,432 m2 80,000 sq ft of data center space in the 21-storey Coda building, converted at 0.0929 m2 per sq ft | 2025-05 | Operator stated | bpb-us-e1.wpmucdn.com |
Systems at this site
| System | Rmax | Power | First operational | Status |
|---|---|---|---|---|
| Phoenix (PACE) | 1.84 PFlop/s | - | 2020 | operational |
Facility fields are recorded only where a public source states them. Blank means we have not found one, not that the value is zero: an important distinction if you are aggregating power or PUE across sites.